Open pit & undergroundHaul-road attenuatorsZero-downtime scheduling
In open pits and quarries every stopped hour costs production. We protect benches, haul roads and high walls with catch fences, above-road attenuators and pinned mesh — keeping operations and crews safe through every stage of extraction.
The same expertise runs underground: shaft and portal linings in ring net, rock support around critical infrastructure. Installation is scheduled inside planned shutdown windows so production is never interrupted.
Scope of works
- High-wall & bench hazard survey
- Bench catch systems
- Haul-road attenuators
- Underground shaft & portal lining
- Installation inside shutdown windows
From the field


