Tender documents

Tender documents and compliance — what we submit with a bid

Procurement officers and consultants ask for the same file on every rockfall and slope protection tender. Here is what is in ours, what each document proves, and when it is included — so a bid can be checked line by line before it is opened.

Updated: 14 September 2026 · Artusa Oman

The standard file

DocumentWhat it showsWhen it is included
Commercial Registration (C.R. No. 1262640) and Oman Chamber of Commerce and Industry membershipA company registered and established in the SultanateEvery bid
Management system certificates — ISO 9001, ISO 14001, ISO 45001, ISO 10002 (Artusa group)Quality, environmental, occupational health and safety, and complaint-handling systems audited by a third partyEvery bid
Company profile and reference listTypes of work, countries, years and quantities; client names are given on request with the client's consentEvery bid
European Technical Assessment and Declaration of Performance under EAD 340059-00-0106, with CE marking, for each barrier system offeredCertified capacity (MEL and SEL), residual height category, maximum elongation and corrosion protection — the numbers a specification is written againstBarrier tenders
Manufacturer test reports, installation manual and maintenance manualHow the system performed under full-scale testing and how it must be built and keptBarrier and mesh tenders
Design report: block-size assessment, rockfall trajectory analysis, barrier line position, height and energy class, anchor dimensioning and the pull-out test planThe engineering basis of what is offered, on the real slope profileDesign-and-build tenders; on request for supply-and-install
Method statement and Inspection and Test Plan (ITP)How the works are executed, in what order, and what is checked at each hold pointEvery bid
HSE plan, including rope-access procedures and — where used — the helicopter lift planHow crews work safely on high, exposed faces above live roadsEvery bid
Personnel: site engineer CVs and certificates of the rope-access techniciansCompetence of the people who will actually be on the ropeEvery bid
Programme and resource planDuration, sequence, crews and equipment; traffic-management windows where the road stays openEvery bid
In-Country Value plan and Omanisation statementLocal content: Omani subcontracting, local materials and Omani hires for the contractGovernment, PDO- and OQ-type tenders, and wherever ICV is scored
Warranty, maintenance manual and inspection scheduleWhat happens after handover and who does whatEvery bid
As-built drawings, anchor pull-out records and installation photographsThe record the owner keeps for the life of the systemAt handover

How to read the system documents

The barrier assessment (ETA) is the document that matters most and is misread most often. It states the Maximum Energy Level, the Service Energy Level, the residual height after the MEL test and the corrosion protection of the components. How these map to a specification is explained in Reading a rockfall barrier specification: ETAG 027 to EAD 340059 and how the class is chosen for a given slope in How to choose the energy class of a rockfall barrier. For anchored mesh the corresponding assessment is written under EAD 230025 — see Anchored high-tensile mesh: how slope stabilization works (EAD 230025).

In-Country Value and Omanisation

Where a tender scores In-Country Value, we submit an ICV plan with the bid. Civil works, concrete, aggregates, fuel, transport and site accommodation are sourced in the Sultanate; site roles are filled with Omani hires wherever the work allows; certified systems and specialist rope-access supervision come from the Artusa group. The plan is written for the specific contract, not copied between bids, so the percentages in it can be checked.

What we ask of the tender

  • A slope survey or, failing that, access for one — trajectory analysis on a real profile beats an assumed one (see Slope survey: drone photogrammetry and laser scanning).
  • The block size the design should protect against, or the freedom to measure it on site.
  • Whether the road or facility below must stay in use during the works — it changes the method, the programme and the price.
  • Clarity on who verifies the anchors: we propose pull-out tests on a stated share of anchors, witnessed by the engineer (see Anchor and rock bolt pull-out testing on site).
Certificates and assessments are provided as copies with each bid; originals are available for inspection at our Sohar office. Documents are issued in English; Arabic translations of the company documents are available on request.

Sources

  • EAD 340059-00-0106 (falling rock protection kits), EAD 230025-00-0106 (flexible facing systems for slope stabilization and rock protection) — European Assessment Documents published by EOTA.
  • Artusa group management system certificates ISO 9001, ISO 14001, ISO 45001, ISO 10002.

Send us your slope.

Share the site and we will assess the hazard, recommend a system and return a costed proposal — engineering-led, no obligation.

Request a site assessment